Friday 17 April 2020

Final Project


Our final project was to create the opening sequence to a film. It had to be between one minute and fifty seconds and two minutes. My group and I reached one minute and fifty five seconds. This project was definitely a challenge. I feel that this project was more of a challenge due to the fact that we were all so busy and it was harder to film on the weekends. In class our storyboard was created. Although we had made our storyboard in class we had to change some scenes while filming. For example, we added in a garage scene. In our original storyboard that wasn't in there so we had to change it. We also used props. The props that we used were a knife and a flower bouquet. Editing this film was definitely harder than editing the other films. Mainly because we had to add in titles and get our film peer edited. After receiving feedback from another group we realized that we had a lot to work on. Finishing the re shooting of our video was challenging to the corona virus. The United states has been put on a mandatory quarantine so it was hard for us to leave the house and meet up. Fortunately, we were able to meet at Laurens house one day and film the final footage or the film. After filming Lauren edited our movie and we assisted her over the phone. This pandemic has really effected the way we work but we are still getting it done even with all of the issues that have been arising. I think that we have come a long way with out filming skills and people will be impressed by our movie.

No comments:

Post a Comment